Landscape Bridge

Project Cases

Landscape Bridge

Project Name:Landscape Bridge

Structure:Steel Box Girder

Total Steel Consumption:160T

Landscape Bridge

The Yaomeng Lake ecological restoration and remediation project is an important part of the Guandao River ecological restoration and remediation project and an important part of the construction of the sponge ecological pattern system. In order to improve the park road system and build a 6.0-meter-wide main park road around the lake, Yaomeng Lake Wetland Park plans to build 7 landscape bridges. The diameter is arranged as 7.5+12+7.5m, and the total length of the bridge is 28m. The total width of the bridge deck is 6.5m, the double-box single-chamber structure, the single main girder is a single-box structure, the width of a single box is 1.75m, and the length of the single-side cantilever arm is 0.5m. The whole bridge is designed in the whole width. The top and bottom of the steel structure of the main girder are set horizontally in the transverse bridge direction. The substructure bridge abutment adopts light abutment and bored pile foundation. The pier cap is rigidly connected with the inclined legs, and the bored pile foundation is used.

SEND A MESSAGE
*
*
*
*
Submit