Project Name:Xinjiang Tacheng International Logistics Park
Structure:Portal Frame
Total Steel Consumption:3500T
Tacheng International Logistics Park is a key construction project of the key development and opening-up pilot zone in Tacheng, Xinjiang. It is located in the first development zone of the pilot zone, with a planned area of 2 square kilometers. The main construction content is a logistics big data center, an international agricultural product trading center, a cross-border combined transportation center, and a smart warehouse service center. Among them, the bulk agricultural product trading platform (Grain Logistics Park in Tacheng District) newly built a bungalow warehouse with a total inventory of 100,000 tons of bulk grain; a new simple shed of 5,000 square meters; and new cold storage (low temperature storage warehouse for finished grains) of 8,000 square meters.
The construction project of Tacheng Ethnic Local Characteristic Industry Exhibition and Sales Base is located in the Baktu Port Smart Logistics Park, key development and opening pilot area in Tacheng, with a total investment of 68.36 million yuan. A new 6,500-square-meter exhibition and sales base for ethnic local characteristic industries is built, with a steel frame structure.The Tacheng agricultural product warehousing and logistics construction project is also located in the Baktu Port Smart Logistics Park, with a total investment of 55.5 million yuan. The new agricultural product storage and logistics area is 4,000 square meters, with a steel frame structure.
The fan blade manufacturing project of Sany Heavy Energy Co., Ltd. is located in the first development area of the key development and opening pilot area in Tacheng. It mainly builds the main engine workshop, blade forming workshop, blade post-processing workshop, comprehensive building, chemical warehouse, blade storage yard and supporting foundations facility. It covers an area of 260,000 square meters and has a construction area of 37,800 square meters.
The tower photovoltaic support manufacturing project of China Water Resources and Hydropower Fourth Engineering Bureau Co., Ltd. is located in the first development area of the key development and opening pilot area of Tacheng. It mainly builds tower workshop, sand blasting workshop, anti-corrosion workshop and other warehouses, power distribution rooms and other workshops and supporting infrastructure. It covers an area of 100,000 square meters and has a construction area of 25,600 square meters.